50kW Anti-Islanding Panel for Three-Phase Inverters
9.144,31 AED
50kW Anti-Islanding Box is the interface protection box for a three-phase photovoltaic power plant up to 50 kW. You use it when connecting a small commercial system to the grid: a warehouse, workshop, farm or office building. Its role is simple: if the grid fails, your power plant stops injecting energy into it.
Why you need anti-islanding protection
Islanding means the inverter continues to power a section of grid disconnected from the distributor. The electrician repairing the line could be in danger. Your equipment may receive voltage or frequency outside of limits. That’s why distribution operators require, when approving plants over 30 kW, separate interface protection from the inverter.
Benefits
- Complete connection file – you have the interface protection required by the operator for approval and energisation.
- Safety for network teams – the power station disconnects when mains voltage is lost.
- Protection for your installation – monitors voltage and frequency and disconnects in case of deviations.
- Pre-wired panel – you install it between the inverter and the main distribution board, without on-site assembly.
- Rated for 50 kW – suitable for a three-phase inverter of this power, such as Fronius Tauro 50.
Compatibility and use
The panel is mounted on the AC side, after the single or three-phase inverter(s), before the connection point. You can use it with any brand of on-grid or hybrid three-phase inverter, as long as the total power does not exceed 50 kW. For larger systems, choose the 100 kW or 200 kW version. The protection settings are adjusted during commissioning, according to the values required in the grid connection technical approval.
Frequently Asked Questions
Is anti-island protection panel mandatory?
For systems over 30 kW, the distribution operator usually requires it in the technical connection notice. Please check your notice for the precise requirement.
Doesn’t the inverter already have anti-islanding protection?
It does, but above a certain operating threshold, the grid operator requires separate interface protection, independent of the inverter.
Can I install it myself?
Installation and configuration must be carried out by an ANRE-authorised electrician, as the panel is included in the commissioning documentation.
Do you have a system of up to 50 kW in your project? Send us the technical specification, and the EcoSolaris team will confirm if the panel is compatible. We’ll also provide you with an installation quote.
Only logged in customers who have purchased this product may leave a review.




Reviews
There are no reviews yet.